Lely Elementary School Roof Replacement

Collier County School District, Naples, Florida

Size: 141,832 SF

System: Fiberglass Shingle

Summary:

  • Removed existing fiberglass shingles, underlayment and deck panels
  • Removed and replaced extensive amounts damaged and corroded steel decking (corroded deck remediation) 
  • Coated entire deck with Sigma anti-corrosive coating 
  • Installed non-tapered Polyisocyanurate rigid insulation board
  • Installed plywood sheathing
  • Installed new fiberglass shingle system and stainless steel flashing metal
  • Replaced damaged/corroded fascia and soffit panels
  • Installed new stainless steel gutter system connecting to existing

AFTER


BEFORE


BEFORE


AFTER


< Back